Inspection Report
Al Sobh Hospital
Total:
103
| With Photos:
80
#1
B1 z4 dirty dish wash
B1
#2
1F z4 famale prayers celling paint is unfinished
1F Zone 4
#3
1F z4 famale prayers celling access not available until now
1F Zone 4
#4
1F-z4 famale prayers tile broken
1F Zone 4
#5
1F-z4 Male prayers celling crack
1F Zone 4
#6
1F-z4 Male prayers toilet tile broken
1F Zone 4
#7
1F-z4 Male and famale prayers room wall and ceiling paint is unfinished
1F Zone 4
#8
1F Z4 near elevator C celling crack
1F Zone 4
#9
1F Z3 IT tile broken
1F Zone 3
#10
Ceiling damage at the second floor, Zone 3, outside the CCU corridor
#11
1F Z3 IT inside tile felling remaining
1F Zone 3
#12
1F Z3 IT celling crack
1F Zone 3
#13
IDF 10 - 1F
#14
1F Z3 IT inside door stopper not available
1F Zone 3
#15
1F Z3 inside IT
1F Zone 3
#16
1F Z3 IT inside panetraition remaining
1F Zone 3
#17
1F Z3 IT inside door frame paint remaining
1F Zone 3
#18
1F Z3 inside door not closing
1F Zone 3
#19
1F Z3 IT inside change celling
1F Zone 3
#20
1F Z3 inside IT floor remaining
1F Zone 3
#21
1F Z3 inside IT door touching Wall damage
1F Zone 3
#22
1F Z3 IT inside Wall paint not good
1F Zone 3
#23
1F Z3 inside IT floor tile is not good
1F Zone 3
#24
1F Z3 inside IT celling not good
1F Zone 3
#25
1F Z3 elevator B celling crack All area
1F Zone 3
#26
1F Z3 elevator B marble broken
1F Zone 3
#27
1F Z3 elevator B marble silicone remaining
1F Zone 3
#28
1F Z3 front of AHU room door handle remaining
1F Zone 3
#29
1F Z3 gym area Wall and celling crack
1F Zone 3
#30
1F Z3 pool area celling have crack
1F Zone 3
#31
1F Z3 near pool door not closing
1F Zone 3
#32
1F Z3 pool area paint is unfinished
1F Zone 3
#33
1F Z3 pool area celling have crack
1F Zone 3
#34
1F Z3 pool area light not working
1F Zone 3
#35
1F Z3 pool area drawer and door paint is unfinished
1F Zone 3
#36
1F Z3 pool area door stopper not available
1F Zone 3
#37
1F Z3 near filtration pump room celling access broken
1F Zone 3
#38
1F Z3 outside nail care room wall protection not good
1F Zone 3
#39
1F Z3 massage room ceiling crack
1F Zone 3
#40
Nail care room celling paint 1F-Z3
1F Zone 3
#41
1F Z3 gym area corridor celling missing
1F Zone 3
#42
1F Z3 massage room ceiling panetraition remaining
1F Zone 3
#43
1F Z3 nail Care room panetraition remaining
1F Zone 3
#44
Treatment room celling paint unfinished Gym corridor 1F
#45
1F Z3 near gym treatment room panetraition remaining
1F Zone 3
#46
Near gym area treatment room wall protection need all area
#47
1F Z3 pool area floor silicone remaining
1F Zone 3
#48
1F Z3 pilates studio door touching floor
1F Zone 3
#49
1F Z3 physiotherapy room door touching door frame
1F Zone 3
#50
Male pool swimming pool boundary tile have cracks 1F
Pool Area
#51
Male pool tile broken 1F
Pool Area
#52
Male pool celling cracks 1F
Pool Area
#53
Hydrotherapy pool boundary tiles cracks 1F
Pool Area
#54
Hydrotherapy pool dehumidifier pipe insulation 1F
Pool Area
#55
Hydrotherapy pool full floor tile not finishing 1F
Pool Area
#56
Hydrotherapy pool roof some area have cracks 1F
Pool Area
#57
Rust on pipe hydrotherapy pool 1F
Pool Area
#58
Front off Hydrotherapy pool class room area celling paint 1F
Pool Area
#59
Front off hydrotherapy pool class room door touch celling 1F
Pool Area
#60
Front off hydrotherapy pool inside class room wall cracks 1F
Pool Area
#61
Front off Staff lounge back side hydrotherapy pool celling cracks 1F
Pool Area
#62
Male physiotherapy reception celling cracks 1F Z4
1F Zone 4
#63
Assessment room sitting lounge area celling paint and cracks 1F
#64
Pediatric physiotherapy Hall all celling have cracks 1F-Z4
1F Zone 4
#65
Seminar hall 1F
#66
Inside seminar Hall 1F
#67
Outside seminar hall
#68
Seminar hall control room 1F
#69
Seminar hall corridor 1F
#70
Seminar hall backside lounge 1F
#71
Inside CSSD paint not finished 2F
CSSD
#72
Inside CSSD celling have Crack 2 F
CSSD
#73
Inside CSSD paint remaining 2F
CSSD
#74
Inside CSSD celling some area have cracks 2F
CSSD
#75
Inside CSSD celling paint not finished 2F
CSSD
#76
Inside CSSD floor tiles need polishing 2F
CSSD
#77
CSSD technician sitting area paint not good 2F
CSSD
#78
Beside CSSD clean utility tile filling not finished 2F
CSSD
#79
CSSD wall paint not finished 2F
CSSD
#80
2F Z4 CSSD area corridor All area
2F Zone 4
No Photo
#81
2F Z4 CSSD area corridor celling crack
2F Zone 4
No Photo
#82
2F Z4 CSSD corridor area ceiling have crack
2F Zone 4
No Photo
#83
2F Z4 CSSD corridor area ceiling paint is unfinished
2F Zone 4
No Photo
#84
2F Z4 CSSD corridor area Wall paint not good
2F Zone 4
No Photo
#85
2F Z4 inside CSSD celling paint is unfinished All area
2F Zone 4
No Photo
#86
2F Z4 CSSD and OR corridor celling paint is unfinished
2F Zone 4
No Photo
#87
2F Z4 CSSD area house keeping room wall and ceiling paint is unfinished
2F Zone 4
No Photo
#88
2F Z4 stairs 5 door lock not working
2F Zone 4
No Photo
#89
2F Z4 OR outside
2F Zone 4
No Photo
#90
Checked vacuum pumps running hours, oil level and all indicators
No Photo
#91
Checked lox tank
No Photo
#92
Check manifold backup O2
No Photo
#93
Checked O2 regulator
No Photo
#94
Checked N2O
No Photo
#95
Checked emergency service manifold n2o
No Photo
#96
Checked manifold air
No Photo
#97
B2 all pipe require proper penetrations
B2
No Photo
#98
Three sprinkler is not installed as per as built drawing
No Photo
#99
Fixed fhc as per drawing
No Photo
#100
B2 core and shell
B2
No Photo
#101
B2 z3 water sepage in wall
B2
No Photo
#102
Not open until now
No Photo
#103
GF OR ceiling hole
GF